Plumbing Piping Works At Port De La Mer, Jumeirah First
Project Introduction
ERTS Technical Services successfully executed plumbing piping works at Port De La Mer, Jumeirah First, ensuring a high-quality water supply and drainage system. This project involved the supply and installation of plumbing pipes, insulation, and drainage systems for multiple apartment types. Our team adhered to strict industry standards and delivered a seamless plumbing solution that met the client’s expectations.
Project Details:
Our scope of work included the complete supply and installation of plumbing piping systems based on the provided design drawings. The work was carried out with precision to ensure optimal performance and longevity.
Key Work Components:
- Water Supply System:
- Installation of PPR water supply pipes for 1, 2, and 3-bedroom apartments.
- Insulation for hot water and hot water return pipes.
- Pex pipe installation for efficient water flow.
- Drainage System:
- UPVC and soundproof pipe installations for various pipe sizes (110mm, 75mm, and 50mm).
- Secure and leak-proof fittings to ensure a long-lasting drainage system.
"Precision in plumbing leads to perfection in performance. At ERTS, we build reliable systems that last."





Client Details
Mr. Mannam Khan, Port De La Mer, Jumeirah First, Dubai
Service Provided
Complete Plumbing & Piping Works
Project Timeline
12 to 15 Working Days